What should you do before starting the renovation?
However, it is better to know what you need to do before starting the renovation to achieve the final and desired result because you will live in the building for a few more years after the renovation.
As a result, you should have a modern, up-to-date, beautiful building. In this article, I would like to point out every step you should take before renovating your home so that any owner who plans to renovate his building will be aware of all the steps and can make the right decision with correct and complete information.
Happy Construction Company has 20 years of brilliant experience renovating houses and apartments and has been able to compete with the best companies. This large and professional company has experts in the field of building renovation and experienced engineers in the area of designing and repairing all kinds of houses. Also, it has intelligent consultants to guide our dear customers. With Happy Construction, you will get a new experience and never regret this company. I can describe the steps before the reconstruction as follows:
The cost and time of the reconstruction project
In answer to the question at the beginning of this article, I must say that the first step in renovating is to estimate how much money and time the owner wants to spend. Of course, a company cannot fully and accurately announce the renovation cost, but it can tell the approximate price. For this reason, estimating the renovation's cost and duration is essential because the owner must know whether he can afford these costs and how long he has to evacuate his house.
Obtaining a reconstruction permit
One of the steps that sometimes the owners are not willing to accept is getting permission for renovation. The reason is usually because of the time it takes to obtain a permit. But if one consults a well-known and reputable restoration company like Happy Construction, one will realize there is nothing to worry about. Even if getting a renovation permit in certain circumstances costs money and takes time, it is still better to accept it. Happy Construction Company always tries to convince its customers to get permission from the municipality so that they don't have problems in the future. The experienced team of this company will personally apply for the license.
Speak to neighbours before the start of the renovation
You may have a neighbour on the construction site of your desired project. It's best to talk to them before you start the renovation. To coordinate with them, you need to notify them of construction because you will disturb the theme for a while, especially if your renovation site is a residential area. You must explain the work conditions and permits to them and provide them with the phone number of the building contractor so that they can contact him when needed.
Whether or not neighbours cooperate during renovations will significantly impact the work process. You have to promise them that you will cause them a minor disturbance. After working every day, you will clean the dirty common area due to construction. Also, apologize in advance for the noise that will be created and ask them to tolerate this situation until the end of the building.
If you have all the permits, you will face many problems if the neighbours do not cooperate.
Delivery of the building to the contractor for a renovation
In the reconstruction process, you must follow all the construction principles. It would be best if you did not undertake anything. The correct handover of the renovation site to the contractor is one of the most critical renovation steps, which, unfortunately, the owners do not pay much attention to it.
Based on the construction principles, the employer and the owner, along with the contractor, must visit the site and check it carefully and then hand over the reconstruction site to the contractor by preparing a meeting report. In this meeting minutes, you should mention the conditions of breakdowns and essential points that you will explain to the contractor. This way, the project site's responsibility will be with the contractor.
I will tell you in simple terms who the contractor is. The contractor is the one who must deliver the tasks entrusted to him within the specified time frame. To check the contractor, you should go to the feedback of previous customers and his work samples. Undoubtedly, it is difficult for you to monitor all the details of the renovation process. You must ensure that the contractor is going to use what quality materials. It would help if you mentioned all these factors in the contract you signed with the contractor. The more straightforward solution is to provide the building materials yourself.
You can see Happy Construction Company's resume in the renovation field on its website. Also, by reading users' comments, you will find out how professional the Happy Construction team is in this work.
Inspection of the building before renovation
Before starting the renovation, you should check all the parts that need to be destroyed. You should specify certain places, such as the water pump, electric panel and gas inlet valve and make sure that they are closed so that they do not cause problems during the renovation. Specify the passage of facilities and ducts that may be shared with other neighbours. You should also check the condition of the engine room and hot water outlet pipes in the central engine room. Disconnect all mechanical installations such as faucets, cabinets, doors and windows. Finally, before starting the reconstruction, check for the last time all the obstacles that may exist in the rebuilding, especially in the demolition stage and cause problems. Pre-renovation inspection is essential for Happy Construction Company, and it is done carefully by a skilled, expert and full-of-ideas team who have studied in this field. Also, a disciplined team and professional, orderly and robust staff are among the most significant factors of their success in their lot of work.
Necessary equipment to start the renovation
At this stage, you should plan for all the facilities and equipment needed to restore the desired place and then get them. Here are a few things you should check:
First, you need to determine a suitable place for the technicians to stay and rest, and you need to determine whether the forces will live at the project site or are only there during work time. Make arrangements for temporary power and lighting at the construction site and take all the tools you need to start the renovation of the project site.
Be sure to put basic medical supplies and fire extinguishers in a convenient and accessible place so that you can use them if necessary. Remove the extra accessories in the renovation area and keep them in a suitable location. The critical point is that you may be faced with a lack of funds to purchase some items. Cooperating with the Happy Construction professional team for cost management is necessary. While helping you manage construction costs, this company delivers the best quality at the lowest price. In this way, you will have the best at a low cost.
Start demolishing the house for reconstruction
After everything is ready to renovate, start the demolition phase. Before anything else, check that the water, electricity meter, and gas valve must be turned off. Start demolition at the desired location under the supervision of a professional team like the Happy Construction Company, which knows all the tricks of the trade. According to the plans, either collect and remove the debris from the demolition site or postpone it to another time.
It is better to do the demolition work when the time to make noise is limited and then collect and remove the trash when it is impossible to make noise. Eventually, I should mention that getting help from a professional engineering team is necessary for success.
Happy Construction Company operates in the renovation of commercial, office and residential buildings and with its disciplined and professional team, it has been able to leave behind a brilliant record. If you are planning to renovate or change the decoration in any building, I suggest you contact the Happy Construction team so that the best work with the best quality will be available to you.
The most crucial stage of building renovation
One of the stages of reconstruction is decoration design operations, which starts after the completion of the facilities. The design and implementation stages of decoration include tiling, stone implementation, laminate installation, plastering, flooring, insulation, and painting and using wallpaper.
Because most of what you see as the result of the work and costs of renovation is done at this stage, you should do it carefully and without any rush. The set of interior decoration is very diverse and comprehensive, that's why it is vital.
Cleaning the project site
Cleaning the project site is one of the stages of reconstruction, which, unfortunately, most contractors ignore, while it is one of the most critical and practical stages of reconstruction. If your renovation project team delivers to you after a thorough cleanup, you will have a more positive view of their work, and the quality of their project will also increase. So, you will be more satisfied with the work, time and money you have spent on this renovation. Until the cleaning of the renovated place is completed, you should not take it over from the contractor.
Because you cannot judge and control the quality of work in different parts of the building until cleaning. Therefore, you need to accept the building after the complete cleaning of the place to recognize the quality of the work better. The quality of the job depends on the company you choose for the renovation. You will get a better result if you choose a reputable and professional company.
Renovation project delivery and after-sales service
After the contractor has checked all the parts of the project site with you and you have declared your complete satisfaction with the quality of the renovation, you should prepare a handover report. It is the same as the meeting minutes on the day of handing over the project to the contractor, with the difference that the building will be handed over to you this time. On the day of project delivery, you must check and record everything, and this project delivery will be temporary.
After delivery and use, the renovation project may have problems. It is normal to see a problem after the delivery of the project; that's why in every contract, the period is determined as a check on the quality of the project in the agreement. During this period, whenever you see a defect caused by the incorrect execution of the renovation, the contractor is obliged to fix the flaws and gain your satisfaction immediately. This time may be a few days, a few weeks, or a few years. This way, rebuilding the project will continue after handing it over to its owner.
Last word
In this article, I tried to tell you what you should do before starting the renovation. I provided practical and valuable content to you, dear user. Happy Construction Company has made every effort to keep its customers satisfied. Enter the link of this company and register your request for the renovation of your home.